Main content

PAC & Music HVAC Upgrades Study

A study to look at humidity and ventilation issues in both buildings and development of both short-term and long-term solutions.

Project Update as of April 8, 2024

Our design firm, Lizardos Engineering Associates, has issued their study to the Campus.  We are looking at possible options for implementation projects.  

Project Overview

The existing building HVAC mechanical systems in both the Performing Arts Center and Music building have exceeded their useful life expectancy.  We are seeing increase in moisture projects in the buildings, and increased mechanical with the various components in each building’s systems.

This study will determine the causes for these problems and help us develop projects to address the issues on both a short-term and long-term basis.


Timeline:  Design

Lead Agency:  Campus-Let

Design:  Lizardos Engineering Associates, PC

Contractor:  TBD

Budget: $