Dormitories: Quad Rehabilitation Project

Renovations to the courtyard between the main residence halls and Outback

Project Overview

The ‘Quad” as it is referred to is, the courtyard located on the inside of the u-shaped residence hall (Big Haus, Crossroads, and Farside) and between the Outback residence hall located to the south. The campus’ Main Dining Hall also resides here. The courtyard is in a state of disrepair, with the majority of its sidewalks and pathways in a deteriorated and unsafe condition. Site drainage is a constant issue and overall site lighting is poor, adding to safety issues at night. This project will correct these issues, provide new accessible pathways between the residence halls and the Main Dining Hall, and create a safe environment for our students to enjoy and interact.

This project will correct these issues and removal all accessible barriers between the buildings and the Main Dining Hall.

 


Lead Agency: DASNY

Design: H2M Architects + Engineers

Contractor: DIA General Construction

Budget: $2million

Project Managers: Muneeza Ismail, Lawrence Manganello


Renderings & Design Drawings

Rendering of proposed changesRendering of proposed changes


Construction Photos (Summer 2018)

Photo of Quad walkway under constructionPhoto of Quad walkway under constructionPhoto of Quad courtyard under constructionPhoto of Quad courtyard under constructionPhoto of Quad courtyard under constructionPhoto of Quad courtyard under constructionAerial view of new pathways in Quad

 

 


Construction Photos (Summer 2019)

 View of Quad courtyard under constructionView of Quad courtyard under constructionView of Quad under constructionView of Quad under constructionView looking towards new pergolaView looking towards new pergolaView of new pergola under constructionView of new pergola under constructionView of Quad under constructionView of Quad under constructionView of new patio in Quad areaView of new patio in Quad areaView of new meditation garden under constructionView of new meditation garden under constructionView of new firelane being installedView of new firelane being installedView of new seating area in front of OutbackView of new seating area in front of Outback