• View of the south facade of the CMFT building.

    Center for Media, Film, and Theatre

    The Center for Media, Film and, Theatre (CMFT) will create a new center for the Conservatory of Theatre Arts, the School of Film and Media Studies, and related arts programs.
  • View of Existing Dance Building Roof

    Roof Rehabilitation at Dance Building

    Addressing ongoing leaks and other problems, while also making the building more energy efficient.
  • Image of storm water drain.

    Stormwater Management Infrastructure Upgrades & Habitat Restoration Project

    Improving our ability to better manage runoff of rainwater and melting snow from our streets, lawns, and fields, while improving overall water quality around the campus and also restoring the surround habitat
  • Photo of masonry probes on the exterior of Campus Center South.

    Exterior Masonry Restoration on CCN, CCS & Neuberger Museum

    Addressing exterior masonry issues to prevent water infiltration and interior damages at the Neuberger Museum of the Art, Campus Center North and Campus Center South.
  • Image of existing PAC exterior stair in disrepair.

    Repairs to PAC Exterior Stairs

    Repairs and upgrades to the existing four exterior stairs that lead from the West 1 & 2 parking lots to the Main Plaza, including new steps, handrails, lighting and masonry restoration.
  • Design rendering of VA restroom.

    Academic Restroom Rehabilitation Project

    Full renovation of over sixty restrooms on campus to ADA compliance and sustainability standards.
  • View of New CHP energy storage unit

    Combined Heat and Power Energy Storage Project (CHP/ES)

    The Combined Heat and Power Energy Storage Project (CHP/ES) is an example of the long-term energy vision for the college coupling together energy efficiency, reusable energy and energy storage which will lead to energy savings, resiliency and learning opportunities to the campus community and beyond.

  • Existing Water Connection Near Front of Campus

    Pump House & Backflow Preventor

    Providing a new pump house near the front of the campus to help increase overall campus water pressure and prevent any backflow into the town’s water system.
  • View of existing Museum southwest courtyard.

    Rehab. of Museum’s Southwest Courtyard

    Addressing an ongoing leak into the Museum’s lower level.
  • View at the entrance into the Visual Arts Building

    Visual Arts Mechanical Upgrades

    Project will address the Visual Arts Building’s aging mechanical air and ventilation systems.
  • Rendering of proposed Control Room.

    Classroom and Technology Upgrades Project

    This multi-phased project will identify a number of classroom and learning spaces throughout the campus to be rehabilitated.