CAMPUS WIDE / HVAC / HEATING VENTILATION AIR CONDITIONING

 

 

 

VISUAL ARTS

3/12/10 Replaced broken Woods coupling on P-2 pump.
2/9/10   Assisted contractor in the removal of leaves and debris under grating at VA due to  fire hazard from welding slag.
1/20/10 Repaired unit heaters near room 1057.
1/13/10 Made repairs to exhaust fans located on roof for room 1057 and changed belts on all units in this area.

 

HUMANITIES

3/12/10 Replaced filters on fan units AC-1 thru AC-4 and performed related PM on units.

 

CCN

2/8/10 Installed a temporary air compressor to supply control air for building HV/AC controls.

 

PAC

1/26/10 Performed PM on AC-7 and R-7.
1/14/10 Made repairs to broken circ. pump on AC-2
3/3/10   Made refrigeration repairs to ice machine Theatre-D.
1/19/10 Rebuilt motor controls for sewage ejector pumps.

 

NATURAL SCIENCES

1/25/10 Repaired insulation on exhaust fan to correct leak at duct.
3/8/10   Added glycol to heating system that serves AC-5, 6,& 7 Replaced broken coupling  on P-13 pump.

 

SOCIAL SCIENCES

2/2/10 Replaced motor on toilet exhaust fan that serves 3 floors of hallway restrooms.

 

DANCE

2/2/10 Replaced belts on R-2 return fan and performed PM on R-1, 3& 4.

 

MUSIC

1/19/10 Replaced frozen and damaged reheat coil at Continuing ED at back door.

 

CCS

2/2/10 Changed filters on AC-1 fan.

 

PHYS ED

1/19/10 Performed PM on ice machine at HYDRO room.

 

ADMINISTRATION

3/3/10 Repaired boiler by replacing nozzle, filter and cleaning.

 

DORMS

3/10/10 Made repairs to toilet exhaust fans on E-F roof.
4/05/10 Made repairs to kitchen exhaust fan KX-5.